We advice you to use laminated pine to make the drawer sides, and to use plywood.
The drawers need 8 pieces so far, and we need 12 more pieces for the island drawers and all the pull out shelves.
Steps for drawer building process :
- Cut the pieces to width and length plus at least an inch.
- Use a joint-er to plane off the saw marks.
- Route 1/8 round-overs on all for corners.
- Use dado blade to cut in the recess for the drawer bottom.
- Cut the pieces to final length.
- Drill holes for assembly screws.
- Sand with 220 grit.
Use 1 5/8" sheet-rock screws and a good bead of wood glue on the corners. Try dipping the tip of the screws in polyurethane glue to allow easy driving.
The drawers need 8 pieces so far, and we need 12 more pieces for the island drawers and all the pull out shelves.
Steps for drawer building process :
- Cut the pieces to width and length plus at least an inch.
- Use a joint-er to plane off the saw marks.
- Route 1/8 round-overs on all for corners.
- Use dado blade to cut in the recess for the drawer bottom.
- Cut the pieces to final length.
- Drill holes for assembly screws.
- Sand with 220 grit.
Use 1 5/8" sheet-rock screws and a good bead of wood glue on the corners. Try dipping the tip of the screws in polyurethane glue to allow easy driving.
0 comments:
Post a Comment