- Took out old windows, modified rough openings to go from 60 to 48 in wide (to allow for more upper cabinets), fixed siding.
- Tore out about 1/3 of the cabinets to get to right window.
- Sanded soffits and put second coat of mud up.
- Picked up granite pieces from the fabricator.
- Removed all cabinets doors and drawer fronts for re-use, and complete installing all drawer and shelf slides.
- Clean gutters since they we overflowing with rain.
- Tore out about 1/3 of the cabinets to get to right window.
- Sanded soffits and put second coat of mud up.
- Picked up granite pieces from the fabricator.
- Removed all cabinets doors and drawer fronts for re-use, and complete installing all drawer and shelf slides.
- Clean gutters since they we overflowing with rain.